Boise Roofing Contract Checklist

The bid tells you what a roofer hopes to do. The contract is what you can hold them to. If something matters to you and it is not in the signed document, plan as though it is not included.

Twelve things that belong in writing

Roofing contracts range from a one-page form with the price circled to a multi-page agreement with attachments. Length does not matter much. Coverage does. Read your draft against this list and ask for anything missing to be added before you sign.

ItemWhat good looks like
PartiesThe registered business name (matching the state record), its address and registration number, and your name and property address
ScopeTear-off, underlayment, ice barrier, drip edge, flashing, ventilation, ridge, pipe boots: each named, matching the bid you compared
MaterialsManufacturer and product line for the main components, and color, so a substitution needs your written approval
Decking termsA unit price per sheet and a requirement to show you damage before replacing it
Start windowAn expected start range and how weather delays are handled
PermitWho applies, whose name is on it, and that the final inspection is part of the job
Payment scheduleAmounts tied to completed milestones, never to dates alone
Lien waiversA waiver with each payment and final waivers at the end
Change ordersWritten and signed by both of you before extra work starts
CleanupDebris removal, gutters cleared, magnet sweep of lawn, beds and driveway
WarrantiesWorkmanship terms in the document, plus who registers the manufacturer warranty
CancellationHow either side can cancel, and what happens to any deposit

None of these should surprise a professional roofer. If a contractor resists putting the scope you agreed on into the contract, take that seriously. It usually means the scope was looser than you thought.

Payment schedules that track the work

The safest payment schedule is one where your money never gets far ahead of the work. On a typical reroof the job moves through a few clear stages, and each payment can line up with one of them. The exact split is something you negotiate; what matters is the shape.

  1. Signing

    If a deposit is required, keep it modest and in proportion to real costs such as ordering materials. Ask what it covers and when materials will be delivered. Never pay cash.

  2. Materials on site

    Some contracts tie a payment to delivery. Check that what arrived matches the product line in the contract before releasing it.

  3. Roof dried in

    After tear-off, deck repairs and underlayment, the house is protected from weather. A natural point for a progress payment, with a lien waiver for the earlier payment.

  4. Final inspection passed

    Hold a meaningful final payment until the city inspection (if required) is passed, the cleanup walk is done and you have final lien waivers and warranty paperwork.

Pay by traceable methods

Pay by check or another method that leaves a record, made out to the business named in the contract, never to an individual and never in cash. Keep a simple log: date, amount, milestone, and which lien waiver you received in exchange.

Change orders: where budgets drift

Once the old roof is off, there will sometimes be surprises: more rotten decking, a hidden layer of old shingles, a chimney that needs more than flashing. That is normal. What should not be normal is extra work done first and priced afterward.

The contract should say that any change in scope or price is written, priced and signed by both of you before the crew does it. On install day that can be as simple as a page on a clipboard with a photo of the problem, a unit count and a total. If you are not home, a text or email with photos and a reply from you can work, as long as the contract says that counts.

  • the change uses a unit price already in the contractconfirm the count and sign
  • the change is new work with no agreed priceask for a written price before it starts
  • the crew says it must be done right nowask for photos and a call from the office first

When an insurance claim is paying

After hail or wind damage, the roof may be paid wholly or partly by your homeowner's insurance. That changes the paperwork in two ways worth knowing about. First, the contract should still describe the scope in plain terms rather than simply pointing to "per insurance estimate." Second, be very careful with any document that assigns your insurance benefits to the contractor or lets the contractor deal with your insurer on your behalf.

Those documents can have real consequences for who controls the claim and the money. Read them slowly, ask your insurance company how they handle contractor involvement, and consider asking a lawyer if anything is unclear. The storm chaser guide covers the pressure tactics that often come with these forms.

Not legal advice

This page explains common contract features in general terms. It is not legal advice. For anything unusual, talk to an Idaho attorney before you sign.

The last read before you sign

Sit down with the final contract, the bid you compared, and the worksheet from the bid comparison guide. Check that every included line from the bid appears in the contract, that the business name matches the state record from your vetting, and that the payment schedule follows the work. Get a copy of everything you sign, including any attachments.

Then the job moves to scheduling. The install day guide explains what to expect once the crew arrives.

Quick answers

Is a signed estimate the same as a contract?

Often it works as one once you sign it, which is exactly why it needs the full scope, payment schedule, change-order rules and warranty terms before you do. If the estimate is a one-line price, ask for a proper written agreement.

How big should a roofing deposit be?

There is no single right number. Keep it in proportion to real upfront costs such as ordering materials, ask what it covers, and pay it to the business named in the contract by a traceable method. Be wary of anyone who wants most of the money before work starts.

Can I hold back money until the inspection passes?

You can negotiate that, and many homeowners do. Tying a meaningful final payment to a passed inspection, the cleanup walk and final lien waivers keeps everyone focused on finishing properly.

What if the roofer wants to switch shingle brands?

If your contract names the manufacturer and product line, a substitution should need your written approval. Ask why, check that the warranty terms still apply, and get the change in writing.